Table of Contents
Table of Contents
This edition first published 2012
© 2012 John Wiley & Sons
Registered office
John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom
For details of our global editorial offices, for customer services and for information about how to apply for permission to reuse the copyright material in this book please see our website at .
The right of the author to be identified as the author of this work has been asserted in accordance with the Copyright, Designs and Patents Act 1988.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher.
Wiley publishes in a variety of print and electronic formats and by print-on-demand. Some material included with standard print versions of this book may not be included in e-books or in print-on-demand. If this book refers to media such as a CD or DVD that is not included in the version you purchased, you may download this material at . For more information about Wiley products, visit .
Designations used by companies to distinguish their products are often claimed as trademarks. All brand names and product names used in this book are trade names, service marks, trademarks or registered trademarks of their respective owners. The publisher is not associated with any product or vendor mentioned in this book. This publication is designed to provide accurate and authoritative information in regard to the subject matter covered. It is sold on the understanding that the publisher is not engaged in rendering professional services. If professional advice or other expert assistance is required, the services of a competent professional should be sought.
Library of Congress Cataloging-in-Publication Data
Ward, John, 1947–
Benefits management : how to increase the business value of your IT projects / by John Ward and Elizabeth Daniel. – 2nd ed.
p. cm.
Rev. ed. of: Benefits management : delivering value from IS & IT investments. c2006.
Includes bibliographical references and index.
ISBN 978-1-119-99326-1 (cloth : alk. paper) 1. Information technology– Management. 2. Information storage and retrieval systems--Business. I. Daniel, Elizabeth, 1962– II. Title.
HD30.2.W368 2012
658.4'038011–dc23
2012022586
A catalogue record for this book is available from the British Library.
ISBN 978-1-119-99326-1 (hbk) ISBN 978-1-118-38158-8(ebk)
ISBN 978-1-118-38160-1 (ebk) ISBN 978-1-118-38159-5(ebk)
About the Authors
John Ward is Emeritus Professor at Cranfield University, School of Management. He was previously Professor of Strategic Information Systems and Director of the Information Systems Research Centre. Prior to joining Cranfield, he worked in industry for 15 years and continues to be a consultant to a number of major organizations. As well as publishing many papers and articles, he is co-author of the book Strategic Planning for Information Systems. He is a Fellow of the Chartered Institute of Management Accountants and has served two terms as President of the UK Academy for Information Systems.
Elizabeth Daniel is Professor of Information Management and Associate Dean Research and Scholarship at the Open University Business School (OUBS). Prior to joining OUBS in 2005, she worked in the IS Research Centre at Cranfield School of Management. Elizabeth’s research has addressed a number of areas including benefits management and IS in marketing and supply chains. Recent work has included studies of home-based online businesses and the uses of consumer and employee data. She has published many papers in leading academic journals and a number of management reports.
Preface
Since the first edition of this book was published in 2006, interest in benefits management has grown, as demonstrated by the number of other publications on the subject and the increased adoption of benefits management approaches by organizations in public and private sectors in a number of countries. In the last six years some professonal bodies have also established benefits management Special Interest Groups.
The difficult financial situation since 2008 has also caused organizations to evaluate their projects more carefully to ensure that they produce worthwhile benefits. This applies to both IS/IT projects and other business change projects and programmes, and the benefits management approach is now being used effectively on non-IS/IT projects in many organizations.
However, our research studies since 2006 have identified that only about 30% of IS/IT projects are completely successful. But what they have also shown is that organizations which have management processes and practices closely aligned with the activities involved with the benefits management process described in this book are more successful than the others. Those studies also show that the issues affecting success are not changing over time: both poor investment decision making and ineffective implementation are still commonplace. It seems that, in many organizations, there is still a limited understanding of the nature of the benefits that can be achieved from IS/IT projects, what needs to be done to deliver them and the key role business managers play in the identification and realization of the benefits.
This book describes a proven process, frameworks and practical tools and techniques that organizations can and do employ to improve the realization of business value from their projects. The single most important tenet of the approach is the dependency of business benefits, not only on the implementation of IS and IT, but also on changing organizational processes and relationships and the roles and working practices of people inside and, in some cases, outside the organization. This inherent interdependency of benefits realization and change management is the reason why we refer to the approach as benefits management.
The process and the underlying tools and frameworks presented in this book are derived from extensive research undertaken by the Information Systems Research Centre (ISRC) at Cranfield School of Management over the last 20 years. In that period, the tools and frameworks have been continually developed and refined, based on their use in many organizations. The key elements of the benefits management approach have been adopted by several hundred organizations worldwide. The widespread application has also provided us with significant real-world insights into the use of the approach, much of which is captured in this book. Our further research, carried out in the last five years, also confirms that adopting a benefits-driven approach to managing IS/IT and other projects increases the business value that can be realized. The findings and management implications from those international studies are included in this edition.
In order to help the reader navigate the book, its structure is illustrated in . This shows how we consider activities needed to effectively manage benefits at two levels: the organizational level and the level of the individual project.
Chapter 1 considers the issues and challenges organizations have to address if they are to select the most appropriate projects and then manage them successfully. The problems and limitations of current project management approaches and the effects they have on the levels of success are discussed. That evidence also suggests that existing methods are insufficient to ensure that the benefits which could be achieved from IS/IT projects are adequately understood or managed effectively.
To be able to identify and manage the benefits, organizations need a clear understanding of the strategic rationale or business reasons for IS and IT investments and the context in which the benefits have to be realized. Chapter 2, therefore, presents tools, frameworks and ways of thinking that are useful in exploring and determining business, IS and IT strategies.
Chapter 3 discusses how benefits management both differs from, but also complements, other proven ways of managing IS/IT projects. The chapter then presents an overview of the whole benefits management process, from initiation, through planning and implementation to final review.
Chapters 4, 5 and 6 consider use of the process at the level of individual projects. The tools and frameworks that underpin the approach are presented and their use discussed and exemplified, including an extended example of their use in a major enterprise-wide IS/IT project in a food processing company. This example is begun in Chapter 4 and is built on in the subsequent two chapters, such that a complete benefits plan is developed and presented.
Chapter 7 considers how organizations can introduce the benefits management approach, the practicalities of adopting the process, tools and frameworks and how they can be used in conjunction with other established investment and project management methodologies and best practices. It also reviews the factors that make some organizations more successful than others in delivering benefits in terms of a benefits management maturity model, developed from our recent research.
A premise of the benefits management approach is that the nature of the benefits that can be realized depends on the specific context of the organization. Chapter 8 considers the use of the approach in a variety of contexts, including distinct types of organization and different application types that are commonly being deployed.
As organizations are undertaking more complex and far-reaching change initiatives, they increasingly have to manage both major business change programmes that are often, at least in part, enabled by IT and also a range of individual IS/IT and other projects. Chapter 9 discusses the use of the benefits management approach in large change programmes and how it can be used to improve the management and governance of the organization’s portfolio of IS/IT investments.
Finally, Chapter 10 discusses and exemplifies how the approach can be used to help in the formulation and implementation of business strategies, thereby providing closer links between investments in IS/IT and change programmes and the benefits that are expected to result from the business strategy. It also considers recent and expected future developments in IS and IT and how the benefits management approach can help with the new challenges these present.
Chapter 1
The Challenges of IS/IT Projects
Information systems and technology (IS/IT) are now essential components of the majority of businesses, allowing them to achieve greater efficiency of operations, increased agility in responding to changing market demands and the ability to develop innovative products and services. Equally, almost all public sector organizations could not deliver their services effectively and economically without the extensive use of IS/IT or ICT, as it is generally called in the public sector. However, despite the consensus about the strategic importance of IS and IT and the considerable investments that organizations continue to make in their purchase and implementation, the realization of benefits remains challenging. Our own research discussed in Chapter 5 (Ward and Daniel, 2008) has found that, in the majority of organizations we surveyed (57%), less than half of the projects they undertook delivered the expected benefits. This is consistent with earlier studies that show the majority of IS/IT projects are judged to be unsuccessful in terms of the benefits achieved.
We would suggest that the bald statistics hide a number of more subtle issues:
At the same time the commercial and social contexts in which those investments are made are changing rapidly, both in terms of globalizing industries and the extensive use of IT in individuals’ lives. Organizations not only have to align and synchronize their IS/IT projects with evolving business strategies, but also meet the expectations of ever-more sophisticated customers and, in the public sector, citizens. The volume of information now held electronically, in combination with legislation, has increased the need for greater security of the data stored to counter the threats from fraud and ‘leaks’, as well as to protect organizations’ assets and individuals’ rights.
While these challenges largely result from the rapidly evolving use of technology and the complex problems associated with the scale and scope of deployment, there are a number of management issues that are critical to successful investment.
Employees often report that their organizations are continually undergoing change, and that the rate of change is increasing. This is often a result of senior managers developing strategies in order to respond to internal pressures on the organization. However, whilst managers are aware of the pressures and can decide on apparently appropriate responses, they are often unaware of the implications of those responses for the staff, ways of working and systems within the organization. Expressed another way, it could be argued that ‘the devil is often in the detail’.
The public sector, in particular, often suffers from disconnects between strategic intentions and the actions that must be undertaken to achieve them. Politicians make announcements on policy or service changes, which often include significant IS/IT projects, without understanding the implications of implementing those systems at the local level. For example, new healthcare systems in the National Health Service (NHS) in the UK usually require implementation across a large number of providers, either Hospital Trusts or Local Health Economies, all of which are at different levels of experience and sophistication with their current systems. The realization of benefits when many separate parties are involved, all of which are at different starting points, is highly challenging.
The promises made by the vendors of information technology suggest that all an organization needs to do to improve its performance is to implement a given application or set of hardware – often termed the ‘silver bullet’ approach to IT deployment. However, considerable research has shown that such implementations should not simply be exercises in technology deployment, but, to be successful, should also be accompanied by complementary changes in processes, the working practices of individuals and groups, the roles of individuals and even the culture of the organization. It is the investment in these organizational factors that is often missing, and this is why benefits are not being realized.
The increased adoption of enterprise-wide systems, as noted above, means that a wider range of users will have access to or be required to use information systems. The investment in such systems is often predicated on the benefits that will be realized by the organization; however, as noted by Jurison (1996), realizing those benefits depends on achieving:
The different stakeholders associated with many new system projects result in a variety of perspectives on what the system is expected to achieve and how changes could be made to deliver these benefits. Unless all the stakeholders understand why change is needed and can agree an approach to achieving the necessary changes, it is likely that individuals and groups will pursue multiple different, potentially conflicting, approaches that can waste time and resources, resulting in difficulty in realizing the expected benefits.
In 2006–2008, we undertook two surveys (one in collaboration with Vlerick Leuven Ghent Management School in Belgium and the other with Cutter Benchmarking Consortium) of senior business and IT managers, in order to explore the activities involved in the delivery of benefits and satisfaction with those activities. In total over 200 responses were received from organizations in over 30 countries. The overall results were almost identical from the two surveys and showed few differences when analysed by geography, type of organization or respondent. The findings relating to satisfaction are summarized in and show that, in most areas, the managers surveyed were not satisfied with their current practices.
Not satisfied with their current approach | |
Identification of project costs | 43% |
Project prioritization | 59% |
Identifying benefits | 68% |
Development of business cases | 69% |
Planning the delivery of benefits | 75% |
Evaluation and review of benefits realized | 81% |
shows that respondents were most satisfied with their identification of project costs. However, whilst some organizations take a comprehensive approach to identifying costs, the survey found that this is not always the case, with many organizations failing to include internal costs associated with achieving business changes, with the implementation of systems and with new ways of working once the system is operational. Without an understanding of the full costs involved in an IS/IT project, it is impossible to be clear on the overall financial value of undertaking the project.
The resources available for new projects are finite within any organization and, in difficult trading conditions, can become very limited. This results in organizations needing to be able to compare projects and identify those that they wish to undertake or, if they are not willing or able to refuse projects, to be able to identify their optimal order and timing. For those undertaking some form of project prioritization, the most frequently cited reasons given were:
However, despite having clear intentions for the prioritization of projects, as shown in , the majority of respondents were not satisfied with their organization’s approach.
Respondents were also dissatisfied with their approach to identifying the benefits from IS/IT projects. Only 35% felt that they were successful in identifying all the benefits arising from a project and only 31% believed that they quantified the benefits adequately. As discussed earlier, the success of projects often relies on a fair share of benefits being realized by all the stakeholders involved. Without such a distribution of the benefits, it is likely that some of the stakeholders will have little interest in the success of the project. Worse still, if they are going to be disadvantaged by the project, often described as receiving disbenefits, then they may actually resist the implementation.
The vast majority of respondents (96%) to the survey said they were required to develop a business case in order to justify investment in IS or IT projects. But, as can be seen from , the majority of respondents (69%) were not satisfied with their approach to business cases. While there is a recognition that information system investments are made to yield benefits to the organization, traditionally business cases have not been explicitly stated in these terms. In many organizations, the business case that is required is essentially a financial assessment. This emphasis is likely to make projects where the benefits are difficult, if not impossible, to express financially hard to justify. However, they may be projects that contribute directly to those areas of the business that are most important to the organization’s future, for example customer care or employee satisfaction. The dominance of a financial mindset within business cases will tend to favour cost-cutting or efficiency projects, which, although worthwhile, may be less beneficial investments than those that improve effectiveness or enable innovation within the organization.
The surveys showed a clear correlation between higher levels of IS investment success and a wide range of benefit types included in the business cases. In particular, benefits associated with sharing knowledge, collaborative working, team effectiveness and individual job satisfaction were far more common in those organizations’ business cases. The less successful tended to focus on efficiencies from process improvements and cost savings.
Delivery or implementation planning involves identifying and planning the activities needed to ensure benefit delivery from the IS/IT project. Whilst most organizations (64%) indicated that they planned technology implementation, far fewer (31%) had clear plans for the organizational changes necessary to realize benefits, for example how staff were organized and how they carried out their work. Again, as discussed earlier, considerable research has shown that, to be successful, technology deployment must be accompanied by complementary changes in processes, the working practices of individuals and groups, the roles of individuals and even the culture of the organization. These changes require as much, if not more, planning and effort in executing the plans as the technical and system elements of projects.
Finally, the area where there is the least satisfaction with current practices is in the evaluation and review of benefits realized. The vast majority of respondents said their organization reviewed the cost of projects (90%), on time delivery (89%) and technical quality (73%). However, only 49% reviewed the delivery of benefits. In addition to not setting aside sufficient time for such reviews, respondents indicated that they felt it was difficult to undertake reviews if the expected benefits had not been clearly set out in the business case at the start of the project. Another reason that organizations may be reluctant to carry out post-implementation benefit reviews is that, perhaps surprisingly, 38% of respondents were honest enough to say that when benefits are identified at the start of a project, they are routinely overstated in order to ensure that the project is approved.
As will be discussed later, further analysis of the survey findings, and subsequent research, has shown that undertaking benefit reviews is directly associated with organizations that are more successful with realizing benefits from their IS/IT projects. This is for a number of reasons. First, reviews allow them to identify unrealized benefits and to instigate further actions to realize those benefits. Reviews also allow the organization to pass learning from one project to another. Finally, if staff know that there will be a review of benefits, they are likely to be more realistic and robust in their identification and quantification of the expected benefits when preparing a business case at the start of a project. Consistent with this, the research found that routine benefit reviews resulted in the preparation of better business cases, resulting in projects that yielded few benefits being identified earlier and not pursued, allowing even greater focus on the worthwhile projects.
The expressed lack of satisfaction with current approaches to the management of benefits suggests the need for a better way. As with any project, it is important to get things right from the outset or considerable time and cost can be wasted in reworking activities already undertaken. A new approach should therefore commence with improved project identification and planning. It should also address the other limitations already described, such as the lack of inclusion of planning and costing for the business change elements of information system projects and the lack of review mechanisms after implementation.
Starting in the mid-1990s, an extended research programme was undertaken by the Information Systems Research Centre (ISRC) at Cranfield School of Management to address the limitations of existing approaches. The research programme, which originally lasted three years but has since been the focus of further research and development activity, was undertaken in conjunction with a number of major private and public sector organizations. The process and tools resulting from this work have been extended and refined from experience gained from the many organizations that have adopted the approach in the last seven to ten years. Key elements of the approach are now in regular use by well over 100 organizations across the world including the UK, Europe, USA, Australia, India and the Far East.
The overall approach developed, called benefits management, can be described as:
The approach is based on a life-cycle process: a set of linked steps to guide the identification, scoping, justification, planning and implementation of IS projects, such that the available benefits from those projects are achieved. The key steps of the process are formulated as interrelated tools or frameworks that can be used to guide and structure the activities and actions needed to implement a project successfully.
The subsequent chapters in this book explain and illustrate, with practical examples, the benefits management process and its underlying tools and frameworks. Before addressing the detailed stages of the process, it is worthwhile considering how the benefits management approach compares with traditional approaches to IS projects and the improvements that it has been shown to yield. This comparison and the improvements resulting from the benefits management approach are shown in . While we would not argue that the activities on the left-hand side of this diagram are wrong or unnecessary, experience from the use of the benefits management approach shows that on their own they are insufficient to deliver many of the anticipated benefits.
Central to the benefits management approach is the identification of and focus on the potential benefits that can arise from the investment, a focus that is continuous throughout the project, from the initial planning stage, through appraisal and implementation, to the final review of the project. Technology delivery remains a key part of the project and, as described later, robust project and systems development methodologies should be adopted to ensure that this part of the project is successful. However, too often technology delivery becomes the raison d’ être of the project at the expense of the benefits the system will deliver to the users and the organization. Many implementations of customer relationship management (CRM), enterprise resource planning (ERP) and e-business systems have been driven as much by the promise of vendors and a fear of being left behind by competitors, as by a clear statement of the benefits they will yield to the organization. Too often, project managers find themselves required to implement the chosen application without a clear understanding of the expected benefits and the organizational changes that will be required.
Money is the language of business and translating all projects, not just IT projects, into a financial case allows senior business managers to believe that they understand the ‘value’ of the project. While they do not need a detailed understanding of technology or the workings of a system, the continued reduction of business cases to financial numbers and ratios reduces those managers’ understanding of the role IS or IT can play in their organization and the types of benefits it can provide. Given also that the financial approach is unlikely to give a full picture, since more qualitative benefits are likely to be excluded from the case, this lack of understanding is likely to be exacerbated.
It is often easier to identify the costs associated with a project than the benefits or value that it will yield. This leads to statements commonly used to describe projects that focus on their cost, rather than their value, to the organization:
The emphasis on financial value to justify investments also results in the use of financial measures to monitor the progress of projects. This has obvious appeal since it is relatively easy to monitor the expenditure incurred on a project as it progresses, but it gives no information on the progress towards achieving the benefits required from the project, the real reason for the investment.
This use of financial measures to track progress also extends to measuring the success of projects, which are often judged to have been successful if they were delivered on time and on budget, regardless of the impact of the system on the performance of the organization. While overruns in either of these would not be encouraged, a project that takes longer or costs more but delivers the intended improvements to the organization should not necessarily be judged a failure.
When asked how they judged the success of an IS/IT project, senior management said it was the ‘value delivered to the organization’, whereas the project managers put delivery to time, cost and quality above value (Nelson, 2005). Although these were considered important by senior management, delivery of the expected benefits was their primary concern.
This focus on the financial case for IS investments, and the relative ease of assessing the cost of a project compared to the value of the benefits it will generate, results in the investment cases often being effectively an expenditure proposal, rather than a true business case – a rigorous argument for a worthwhile investment. To be comprehensive, the business case should state clearly how the intended project will contribute to the strategy and performance of the organization. An investment could be justified on the basis of cost savings alone, but others will provide new capabilities, such as additional channels to market. If the business strategy stated a need for significant cost reductions or to increase the customer base, these projects would be clearly aligned with the strategy; if not, then, although the projects sound attractive, other investments may be more important, especially when funds and resources are limited.
In the benefits management approach described in this book, the planning for a project and the subsequent development of the business case commences with an understanding of the current and expected strategic drivers acting on the organization and hence ensures that projects and benefits are tightly linked to organizational strategy.
The lack of recognition of the importance of the social element to IS and IT deployment often results in the need for many of the changes to ways of working being overlooked. In particular, the tendency for such projects to be led by IS staff, rather than business staff, exacerbates this lack of recognition of the impact the system will have on individuals and groups. This may well not be intentional, but is often driven by inadequate understanding of how the business operates by those in the IT department. Many organizations are trying to address this issue by having individuals from within the business participate in IS/IT projects and even lead them. However, they may fail to release those individuals from their day-to-day responsibilities, whereby involvement in the project becomes an additional burden for which they have little time. This can result in participation in the early stages of a project, and then leaving it with the IT team until it is ready for delivery. shows an example of an organization that implemented its ERP system twice: the first time unsuccessfully for the reasons above, and, courageously, the second time having learned from the earlier failure.
If the project is more than six to twelve months in duration, it can be expected that many factors, both within the organization and in the wider business context, will change. Continued involvement of the business managers is required to identify the implications for the project and address the resulting issues as they emerge.
The rapid pace of change of IT, coupled with the technical language of IT staff, frequently causes business managers to feel that they do not understand IT in the same way that they believe they are familiar with, for example, marketing or other functions of the business. They therefore feel vulnerable when involved in appraising IS/IT projects, contributing to their preference to have such projects expressed in ‘hard’ financial terms. This feeling of vulnerability was expressed by business staff in those organizations which took part in the original research project as a feeling of being ‘an onlooker or victim where IT is concerned.’
The benefits management process addresses this issue by proposing tools and frameworks that both the business and IT staff use together, in order to ensure both communities contribute their knowledge and that the combined knowledge produces something neither group could have developed alone. The tools and frameworks are all intended to be used in workshop settings, to encourage participation from multiple individuals from both the business and IT groups. It has been found, through the extensive experience of using the process, that it encourages collaboration, more than the exchange of large, complex documents. Those involved also often actually enjoy the experience, something many of them say has not happened in previous IS/IT projects!
IS and IT vendors are keen to promote the many features of their products and, all too often, organizations believe that the list of features equates to a list of benefits that the systems will provide to their organizations. However, this is seldom the case and can result in organizations buying and installing systems that either do not meet their needs or are overly complex. As a result, those systems tend to be under-utilized and hence fail to deliver the expected benefits.
The benefits management approach looks at this issue from the other direction. Rather than starting with the features and functions of the technology or system, benefits management elicits what is causing the organization to consider the investment and hence the improvements the project is expected to deliver. It is only when this and any changes needed to make those improvements have been identified that the IS and IT required should be assessed, leading to a technology specification that is ‘sufficient to do the job’.
This does not imply that organizations should purchase under-specified hardware or software that would soon be insufficient to meet their needs. Rather it is to counter the emphasis of many vendors on the long list of features and functionality that they can provide, which can lead to incurring unnecessary cost. However, it is also often the case that vendors sell their products in packages or suites, so that it will cost little more to buy some additional functionality than the cost of the minimum requirements. The additional functionality should be evaluated to see if it contributes further benefits that would address the strategy or objectives of the organization. If it does not, it should not be purchased or, if bundled in, should not be implemented.
Just as business managers may feel they are ‘victims’ in IS/IT projects, others who will be impacted by the system often believe that they are ‘subjected to IS/IT’, rather than feeling that they are contributing to and shaping the project. An important part of the benefits management approach is the consideration of the project from the perspective of a wide set of stakeholders, in part at least to address the ‘what’s in it for me?’ question most of them will be asking. At the heart of the benefits management approach is having ‘benefit owners’ who take responsibility for planning the actions needed to realize each benefit. If no one is willing to take ownership, this suggests that the benefit is either not wanted or not credible and hence will not be realized.
Ideally, many of those stakeholders or their representatives, if they are large groups, should be involved in scoping and planning the project, and in particular identifying the benefits and changes involved. They are then needed to be actively involved in making some of the changes and in tracking and realizing the benefits. In most projects, one group will have to make changes to deliver benefits to another group, and the two will need to work together. In addition to encouraging participation in planning and implementation activities from a wide range of stakeholder groups, the approach includes a particular set of tools that specifically uncovers the views and concerns of each stakeholder group and identifies actions that may be needed to encourage or sustain their cooperation.
Surveys continue to show that firms invest little time and money in training their staff to use IT and IS. This problem tends to be particularly severe in the UK, with surveys showing that, compared to other European countries, organizations spend less per head of workforce on IT training, leading to reduced business effectiveness and personal productivity from IT use. Many projects are started with a defined training budget. However, this is often not sufficient to provide enough training for individuals to become familiar, let alone confident, with the new system (see ). Even when a project does start with an adequate training budget, if it runs late or over-budget, it is often the training budget that is reduced to make up the shortfall elsewhere.
The iSociety report (2003) found that, all too often, training on new systems was left to informal, on-the-job training undertaken by colleagues. Even with formal training in place, such informal training is beneficial, since use of a system will depend on the details of a particular context. However, the existence of such informal mechanisms should not be taken as an opportunity for managers to abrogate their responsibility to provide basic systems, technology and even business skills training.
While training staff in how to use technology and systems is important, this is often not sufficient in itself. To ensure projects deliver the full set of potential benefits, it is usually necessary not only to teach individuals which screens to access and which keys to press, but to demonstrate to them how the system can improve the role that they carry out for the organization. This training in the impact or exploitation of the technology should include an appreciation of how use of the system will impact others and other processes in the organization. Undertaking this education in exploitation will allow individuals to consider new ways of using the system or technology in their particular role, harnessing their experience and creativity.
Many systems today may not offer a net benefit to the individual. Rather, the major benefits accrue to the entire organization. This may include knowledge management and CRM systems, where individuals are expected to share their expertise or customer contacts. Without a clear understanding of how the use of these systems will benefit the organization, individuals will be reluctant to use them – particularly if it seems their role will be diminished. A lack of appreciation of the wider picture leads to individuals bypassing the new systems and continuing to store information on their local databases and personal devices.
While many organizations have been keen to describe themselves as learning organizations, as shown in few carry out post-implementation reviews, seriously limiting their ability to learn collectively from the experience gained from projects.
The benefits management process includes a post-implementation benefits review as an integral component of the project. This review should not concentrate on the use of technology or on the project management; rather, technology and project audits should be carried out separately. Instead, the benefits review should explore which of the planned benefits have been realized, whether there were any unexpected benefits arising and which planned benefits are still expected but may need additional attention to ensure that they are realized. Actions should then be put in place to enable these benefits to be realized.
The benefits review should also consider if, given what has been achieved so far, there is an opportunity for further benefits to be realized. It is often not possible at the outset of a large project to foresee all the benefits that can be achieved when the system is in operation, and new or emergent benefits are often identified as business changes are implemented. Many of the current large-scale enterprise-wide system deployments are initially intended to overcome problems resulting from the use of a range of existing, often incompatible, systems. Once the organization becomes used to operating without these problems, it can then consider how the system can be used to improve overall performance across the organization and also how it could enable new, innovative ways of working.
Before undertaking an exploration of how the benefits from information systems might better be realized, it is worthwhile considering and clarifying the terms that are used in this field. The following section discusses major terms in common use and defines how they will be used throughout this book.
Information technology (IT) refers to the technology on which information systems operate or run. It refers specifically to the hardware, software and telecommunications networks that underpin information systems. Some commentators and organizations, particularly in the government and public sectors, use the term information and communication technologies (ICT), rather than simply IT, in order to stress the convergence of traditional hardware and software with the networks that characterize communications technologies.
Our definition of information systems (IS) is adopted from the UK Academy for Information Systems (UKAIS):
The UKAIS notes that the use and study of these systems includes both the underlying technological and social aspects. Within the business sphere, this social dimension is concerned with how individuals, teams and even whole organizations adopt and use information systems and how this use, in turn, shapes those information systems. This means that a consideration of information systems must take into account not only the technologies that enable them but also the inherent social implications. It can therefore be seen how the interchangeable use of these terms can lead to misunderstandings: with over-reliance on the term ‘information technology’ devaluing the importance of the social dimension, which, as has already been stressed, is critical to the realization of benefits.
Two other terms now in common usage are electronic commerce (e-commerce) and electronic business (e-business). Kalakota and Whinston (1997) define e-commerce as ‘the buying and selling of information, products and services via computer networks’, the computer networks primarily being the Internet. Hence, e-commerce refers to information systems carrying out trading activities focused outside the organization itself, for example with customers and suppliers. E-business, in contrast, refers to more general automation of information exchanges and organizations’ business processes and transactions, both within organizations and with trading partners.
Another term that is often used when discussing information systems is applications. Applications are information systems that are used to accomplish a specific business activity or automate a particular process. Examples of simple applications are the word processing and spreadsheets found on virtually every PC. More sophisticated applications are used to carry out activities such as general accounting, production scheduling or warehouse management. Such applications are often now sold as packages or suites, comprising a number of separate applications. Recently there has been a trend to develop very large suites of applications that, when implemented, impact the activities of many processes or functions within an organization. These enterprise systems, which include ERP and CRM systems and enterprise portals, pose significant challenges for the realization of benefits, which will be considered throughout this book.
Organizations still face the difficult decision of whether to develop applications in-house to meet their specific needs, often termed bespoke or customizedet al.