
Contents
Preface
Abbreviations used in the text
Notes before reading
Part I: Preliminaries
1 Introduction
1.1 What is a contract?
1.2 Purpose of building contracts
1.3 Types of construction contracts
1.4 Characteristics of a standard form
1.5 Commonly used contracts
1.6 Important background to SBC
1.7 SBC and variants
2 Basic matters
2.1 Works
2.2 Drawings
2.3 Specification
2.4 Schedules
2.5 Bills of quantities
2.6 The Standard Method of Measurement
2.7 Privity of contract and the Third Party Act
2.8 Third party rights and collateral warranties
2.9 Base Date
2.10 Common problems
3 About the contract documents
3.1 What constitutes the contract?
3.2 What are articles and recitals?
3.3 How to complete the contract form
3.4 Priority of documents
3.5 Errors, discrepancies and divergences
3.6 Custody and copies
3.7 Limits to use
3.8 Reckoning days
3.9 Certificates, notices and other communications
3.10 Applicable law
3.11 Common problems
4 Related matters
4.1 The Housing Grants, Construction and Regeneration Act 1996 as amended
4.2 Entire contracts
4.3 Express and implied terms
4.4 Limitation periods
4.5 Letters of intent
4.6 Quantum meruit
4.7 Limited companies
4.8 Bonds
4.9 Common problems
Part II: Participants
5 The architect’s powers and duties
5.1 What the architect can do or must do
5.2 Specific requirements under the JCT contract
5.3 Powers
5.4 The architect’s design role under SBC
5.5 The architect as agent for the employer
5.6 No power to direct contractor
5.7 Issue of certificates
5.8 The issue of instructions
5.9 Instructions in detail
5.10 Issue of information
5.11 Duties under the contract
5.12 General duties
5.13 Does the architect have any duty to the contractor?
5.14 Common problems
6 The contractor’s powers and duties
6.1 What the contractor can do or must do
6.2 Person-in-charge
6.3 Access to the Works and premises
6.4 Carrying out the Works
6.5 Levels and setting out
6.6 Workmanship and materials
6.7 Contractor’s master programme and other documents
6.8 Statutory obligations
6.9 Antiquities
6.10 Drawings, details and information
6.11 Compliance with architect’s instructions
6.12 Suspension of performance
6.13 Does the contractor have a duty to warn of design defects?
6.14 Common problems
7 The employer’s powers and duties
7.1 What the employer can or must do
7.2 Express and implied powers and duties
7.3 General powers
7.4 General duties
7.5 Common problems
8 Consultants
8.1 General points
8.2 Quantity surveyors
8.3 Employer’s representative/project manager
8.4 Structural engineers, mechanical engineers and others
8.5 Common problems
9 The clerk of works
9.1 Method of appointment
9.2 Duties
9.3 Snagging lists
9.4 Defacing materials
9.5 Common problems
10 Sub-contractors and suppliers
10.1 General
10.2 Assignment
10.3 Sub-contracting
10.4 Listed sub-contractors
10.5 Named specialists
10.6 Common problems
11 Statutory authorities
11.1 Work not forming part of the contract
11.2 Statutory authorities in contract
11.3 The CDM Regulations 2007
11.4 Common problems
Part III: Work in progress
12 Insurance
12.1 Why insurance?
12.2 Types of insurance in the contract
12.3 What is an indemnity?
12.4 Injury to persons and property
12.5 Things that are the liability of the employer
12.6 Insurance terms
12.7 Insurance of the Works: alternatives
12.8 A new building where the contractor is required to insure
12.9 A new building where the employer insures
12.10 Alterations or extensions to an existing building
12.11 Benefits for sub-contractors
12.12 The Joint Fire Code
12.13 Terrorism cover
12.14 Common problems
13 Possession of the site
13.1 General
13.2 Date of possession
13.3 Common problems
14 Extension of time
14.1 Basics
14.2 Extension of time
14.3 Grounds
14.4 Procedure
14.5 Important conditions
14.6 Common problems
15 Liquidated damages
15.1 What are liquidated damages?
15.2 Procedure
15.3 Common problems
16 Financial claims
16.1 Loss and expense claims
16.2 Procedure
16.3 Effect on regular progress
16.4 The architect’s opinion
16.5 Ascertainment
16.6 Reimbursement under other contract provisions
16.7 Relevant matters forming the basis of a claim
16.8 Certification of direct loss and/or expense
16.9 Contractor’s other rights and remedies
16.10 Common problems
17 Architect’s instructions
17.1 Purpose
17.2 Scope
17.3 Common problems
18 Variations
18.1 What is a variation?
18.2 Does extra work always involve payment?
18.3 Valuation
18.4 Treatment of approximate quantities, defined and undefined provisional sums
18.5 If the conditions for carrying out other work are altered
18.6 Valuation of obligations and restrictions
18.7 Schedule 2 quotations
18.8 Acceleration
18.9 Daywork
18.10 Valuation of contractor’s designed portion
18.11 Common problems
19 Payment
19.1 The Contract Sum
19.2 Valuation
19.3 Method and timing
19.4 Payment procedure
19.5 Retention
19.6 Final payment
19.7 The effect of certificates
19.8 Off-site materials
19.9 Fluctuations
19.10 Common problems
20 Contractor’s design
20.1 Contractor’s Designed Portion (CDP)
20.2 Documents
20.3 The contractor’s obligations
20.4 Liability
20.5 Variations
20.6 Insurance
20.7 Common problems
Part IV: Closing Stages
21 Practical completion
21.1 Definition
21.2 What the contract says
21.3 Consequences
21.4 Partial possession and sectional completion
21.5 Common problems
22 Defects liability
22.1 During construction
22.2 Rectification period
22.3 Definition
22.4 Defects, shrinkages or other faults
22.5 Frost
22.6 Procedure
22.7 Common problems
23 Termination
23.1 General points
23.2 Termination by the employer
23.3 Grounds: contractor’s defaults
23.4 Grounds: insolvency of contractor
23.5 Grounds: corruption
23.6 Grounds: neutral causes
23.7 Grounds: insurance risks and terrorism cover
23.8 Consequences of termination for contractor’s default or insolvency
23.9 Consequences of termination for neutral causes or insurance risks
23.10 Termination by the contractor
23.11 Grounds: employer’s defaults
23.12 Grounds: insolvency of employer
23.13 Grounds: neutral causes
23.14 Grounds: insurance risks and terrorism cover
23.15 Consequences of termination for employer’s default, neutral causes or insolvency of the employer, etc.
23.16 Consequences of termination for insurance risks
23.17 Suspension of the Works by the contractor
23.18 Common problems
Part V: Intractable Problems
24 Dispute resolution procedures
24.1 General
24.2 Adjudication
24.3 Arbitration
24.4 Legal proceedings (litigation)
24.5 Mediation
24.6 Common problems
Notes and references
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Chapter 9
Chapter 10
Chapter 11
Chapter 12
Chapter 13
Chapter 14
Chapter 15
Chapter 16
Chapter 17
Chapter 18
Chapter 19
Chapter 20
Chapter 21
Chapter 22
Chapter 23
Chapter 24
Table of cases
Subject index
Clause number index to text

This edition first published 2014
© 2014 by David Chappell
Registered Office
John Wiley & Sons, Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.
Editorial Offices
9600 Garsington Road, Oxford, OX4 2DQ, United Kingdom.
The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.
For details of our global editorial offices, for customer services and for information about how to apply for permission to reuse the copyright material in this book please see our website at www.wiley.com/wiley-blackwell.
The right of the author to be identified as the author of this work has been asserted in accordance with the UK Copyright, Designs and Patents Act 1988.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher.
Designations used by companies to distinguish their products are often claimed as trademarks. All brand names and product names used in this book are trade names, service marks, trademarks or registered trademarks of their respective owners. The publisher is not associated with any product or vendor mentioned in this book.
Limit of Liability/Disclaimer of Warranty: While the publisher and author(s) have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. It is sold on the understanding that the publisher is not engaged in rendering professional services and neither the publisher nor the author shall be liable for damages arising herefrom. If professional advice or other expert assistance is required, the services of a competent professional should be sought.
Library of Congress Cataloging-in-Publication Data
Chappell, David (David M.)
The JCT standard building contract 2011 : (an explanation and guide for busy practitioners and students) / David Chappell.
pages cm
Includes bibliographical references and index.
ISBN 978-1-118-81975-3 (pbk.)
1. Construction contracts–Great Britain. I. Joint Contracts Tribunal. II. Title.
KD1641.C487 2014
343.4107 ′8624–dc23
2013030499
A catalogue record for this book is available from the British Library.
Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books.
Cover image: iStockphoto/A-Digit
Cover design by Steve Flemming, Workhaus Publishing Design and Advertising
It always seems to me that books about contracts are difficult to read, because they are littered with clause numbers and references to legal cases. Moreover, they make too much use of what I can only describe as legal words that may not be immediately comprehensible to many people. Therefore, it is a real chore to find exactly what one is seeking (and to understand it when found), even with the aid of a good subject index.
From the feedback I have received, what most architects, quantity surveyors, project managers, builders and yes, employers, are looking for is a book that sets out in plain words exactly what the contract requires in various circumstances. They do not want simply a repetition of the wording of the clauses nor a long exposition of the legal niceties. That is not to say there is not a place for detailed books on building contracts loaded with references to cases and full of legal argument – I have written some of them myself. But there is clearly a need for a book with a sensible down to earth approach to what the contract requires from the various participants.
In this volume I have tried to write a simple book about the JCT Standard Form of Contract 2011 which is a complex contract, but one in common use. By ‘simple’ I do not mean ‘brief’ or ‘superficial’ with poor grammar or full of jokes; but rather a book that is not full of legal phraseology with constant references to clause numbers and a book that does not assume any particular legal or contractual expertise on the part of the reader. But it does assume that the reader is a competent contractor or constructional professional. The text is not limited to words of one syllable.
I have used straightforward words, short paragraphs, many sub-headings and explained, often from first principles, many issues such as exactly what we mean by a contract, why there are extension of time clauses, why there is a rectification period and the limits on architects’ powers. The book is divided into topics, because experience tells me that it is the most sensible way to deal with it. At the end of each chapter I have included a section dealing with some problems that have arisen in practice related to the subject matter of the chapter.
There are clause numbers in the margin next to the relevant text. For those who like to dig a little deeper, a list of relevant cases are in a section at the back and the reference numbers are also in the margin in a different typeface. Several tables are included, listing such things as architect’s instructions, certificates to be issued and the powers and duties of architect, employer and contractor. There are also some flowcharts for those who like that kind of thing.
It is not difficult to write a complicated book about a complicated subject. The trick is to write a simple book about a complicated subject. This book has been one of the most difficult tasks I have attempted, but I believe that it was well worth doing. Just because this book is intended to be easy to read does not mean that things have been omitted. Hopefully, the book is just as comprehensive as any other book on this subject. Indeed I would want it to be more comprehensive than others.
One of the criticisms often made about a book like this is that is does not properly express what the contract says. That may well be true in an absolute sense. The only way to precisely express what the contract says is to reprint the contract in its entirety and nothing more. Any explanation will inevitably fall short in some way. Nevertheless, until the people responsible for drafting contracts find a way of drafting them in clear and simple English, users of the contract will seek simple explanations. Although it may be that certain parts of the contract are subject to various explanations, not all of them consistent, it is not helpful to busy people trying to administer or work under a contract to find that the advice is that it may be this or it may be that. In these situations, I have taken a view of the position.
In a book of this kind, which splits the content into topics, it is inevitable that some of the same things fall under different topics. For example, the issue of instructions naturally falls under the architect’s duties, but also warrants a standalone chapter. Although there may be some repetition in these cases, I have tried to make such references complementary and cross-referenced the most important. The index is intended to signal all the places where information on a particular matter can be found.
Throughout the text, it has been assumed that the contractor and sub-contractors are corporate bodies (e.g, limited companies) and they are each referred to as ‘it’.
My thanks to Michael Cowlin LLB(Hons) DipOSH DipArb FCIArb Barrister (not practising) and Michael Dunn BSc(Hons) LLB LLM FRICS FCIArb who have given helpful feedback on various points.
I acknowledge a debt to John Parris, whose classic work on the JCT Standard Form of Building Contract it was my privilege to revise in 2002. He had a way with words that I cannot emulate but that made the most complex material eminently readable.
Finally, I acknowledge a lifetime of debt to my wife, Margaret, who died in April 2012 when I had just started this book. It is only the certainty that I will be reunited with her in the future that continues to fuel my enthusiasm for writing.
David Chappell
Wakefield
ACA 3 | The ACA Form of Building Agreement 2003 |
CC | Construction Confederation |
CDP | Contractor’s Designed Portion |
CDM Regulations 2007 | Construction (Design and Management) Regulations 2007 |
DB | Design and Build Contract 2011 |
GC/Works/1 (1998) | The General Conditions of Government Contracts for Building and Civil Engineering Works |
IC | Intermediate Building Contract 2011 |
ICC | Infrastructure Conditions of Contract |
ICD | Intermediate Building Contract 2011 with contractor’s design |
JCT | Joint Contracts Tribunal |
MW | Minor Works Building Contract 2011 |
MWD | Minor Works Building Contract 2011 with contractor’s design |
NEC 3 | Engineering and Construction Contract 2013 |
NFBTE | National Federation of Building Trades Employers |
PPC2000 | The ACA Standard form of Contract for Project Partnering 2008 |
RIBA | Royal Institute of British Architects |
RICA | Royal Institution of Chartered Surveyors |
SBC | Standard Building Contract 2011 with quantities |
SMM | Standard Method of Measurement |
There are no references to contract clauses or legal cases in the text.
The relevant clause or schedule number is shown in the margin opposite the portion of text.
Reference numbers to legal cases and some other things are also in the margin. These notes can be found at the back of the book for those who really want them.
The idea is to present an unimpeded, easy to read explanation of the contract, but with the facility to easily locate the further information.
Clause and schedule numbers are in italic; reference numbers are in bold.
Everyone is subject to the law of the country in which they live. In general, the law is divided into two parts: criminal law and civil law. If we break the criminal law, we may find ourselves having an interview with the police. There are also Acts of Parliament that make doing things or failure to do other things a criminal offence. The Health and Safety at Work Act 1974 is an example of one such Act. Most people understand that very well.
The civil law governs the way we should behave to our neighbour. We all have rights and duties to each other. They are sometimes set out in Acts of Parliament and sometimes they are derived from the judgments of the courts. Law that is found in the judgments of the courts is usually referred to as the ‘common law’. These are duties and rights that are there whether we like it or not.
In general ‘tort’ is a civil wrong for which the person suffering the wrong is entitled to take action through the courts for compensation. It is based on the duty that everyone owes to one another. There are many wrongs that most people will recognise and that will come under the headings of ‘tort’. Such things as negligence, trespass, nuisance and defamation are concepts in general use; although not always properly understood.
As well as these legislative or common law rights and duties, two people may agree additional rights and duties to each other. For example, I may agree to buy a clock from a shop for £100. I have a right to receive a clock, but a duty to pay £100 for it to the shop. The shop has a right to the £100, but a duty to supply the clock. Where there are agreed rights and duties on both sides we call it a contract. Of course there are all kinds of other things that also might have to be agreed, such as the style, make and colour of the clock and the date on which I must pay. That is why even the simplest contracts can become quite complicated.
We usually say that two people have ‘entered into’ a contract or that a contract has been ‘executed’ if documents have been signed. Contracts are legally binding, which means to say that usually once the contract is agreed, neither person can say: ‘I’ve changed my mind now’ without serious consequences. If one person does something that the contract does not allow or fails to do something that the contract requires, it is referred to as a ‘breach’ of contract.
For example, if I only pay £95 for the clock, or if the clock is supplied in a different colour or style, or if it does not work. These are all breaches of contract. It is not always appreciated that it would also be a breach of contract if I was supplied with a better clock worth £150 when we had agreed a particular clock for £100.
The person who is not in breach is usually referred to as the ‘injured party’ or the ‘innocent party’. The injured party is entitled to receive payment from the person in breach to make up for the breach. That is called ‘damages’. The amount of money to be paid is normally calculated to put the injured party back in the same position as if the breach had not occurred. Sometimes that is easy, for example, I could be ordered by a court to pay the additional £5 together with any other costs I had caused as a result of my failure to pay the full £100 for the clock. Sometimes it is not possible, but a court tries to do what it can to rectify the situation.
If the breach of contract is particularly serious, it may be what is called ‘repudiation’. That is a breach that is so serious that it shows that one of the persons wants nothing more to do with the contract. Extreme examples would be if I refused to pay anything for the clock or the shop took my money but refused to provide any clock at all. In building terms, it might amount to a contractor walking off site, never to return, half-way through the project or the employer telling the contractor that he would not be paid any more money.
Faced with repudiation, the injured party has the choice of, either accepting the repudiation and seeking damages through the courts, or saying that the contract is still in place and carrying on with it (called ‘affirmation’). The injured party is still entitled to seek damages even after affirmation. Obviously, there are many instances where it is just impossible to carry on as if nothing had happened; for example if the contractor walks off site.
People sometimes get confused between a promise by one person to do something for another and a contract. In order for there to be a contract there must be three things:
Agreement is usually demonstrated by showing that one person made an offer and another person accepted it. Using the clock example: if I offer £100 for the clock and the shopkeeper accepts, there is an agreement.
An intention to create legal relations is usually assumed in commercial dealings and it is for the person who says that there was no such intention to prove it. In a social context, people do not always intend to create legal relationships. If Tim says to Lucy that if she joins him at a restaurant that evening, he will buy her a meal, that is not a contract and the arrangement can be broken with impunity.
Something given by both persons is fairly straightforward. In the case of the purchase of the clock, I agree to give the shopkeeper £100 and the shopkeeper agrees to give me the clock. This can be expressed in various ways. For example, it can be said that the shopkeeper promises to give me the clock if I give the shopkeeper £100. In a construction contract, the contractor promises to construct the building and the employer promises to pay whatever is stated in the contract as the Contract Sum. In legal terms, it is usually referred to as ‘consideration’. This consideration can take forms other than the ones just described. For example, one person may agree to pay another, if that second person agrees to stop doing something or not to do something he or she was about to do. The important thing is that both persons contribute something; not necessarily of apparent equal value.
When talking about contracts, it is customary to refer to the ‘parties’ to the contract. That is convenient when reference to ‘persons’ would not be appropriate – for example, where one or both parties are corporate bodies such as local authorities, universities or limited companies.
There are two types of contract:
Most contracts are simple contracts. If it is desired to make a contract in the form of a deed, it is necessary to observe a particular procedure. Before 1989, all deeds had to be made by fixing a seal to the document. That could be in wax, but more often it was simply a circular piece of red paper embossed with the name of the relevant party. Nowadays, the procedure is laid down by statute. Essentially, the document must clearly state that it is a deed and the parties must sign in one of the prescribed ways. The alternative ways are usefully set out in JCT contracts on the attestation page.
A deed is a very serious form of contract. Its attributes are:
Therefore, a contract should not lightly be entered into as a deed.
Broadly, the purpose is to get a building erected. The contract sets out the rights and the duties of the parties: what each may do and what each must do. It also sets out the procedure for certain things. For example, how the contractor can have the time allowed for constructing the building extended, or how the architect can get an instruction carried out if the contractor is slow, or on what grounds either party may bring their duties under the contract to an end. In SBC, there will be an employer (who employs the contractor) and the contractor (who carries out the construction work). There is also a contractor administrator who is often, but not necessarily, an architect (and assumed to be so in this book) and who does the things allocated in the contract and a quantity surveyor who is principally concerned with valuing the work.
Construction contracts can be analysed into three types relating to costs:
1
This is where the contractor undertakes to do the specified work for a sum not adjustable in the price of goods or labour. This is the common situation when a contractor quotes for the installation of a shower or other minor building work. It is commonly thought that if a contractor submits what he terms an ‘estimate’, he will not be bound by the price. Indeed, if the final price is much higher, the contractor will often remark that what he originally gave was ‘just an estimate’. That is certainly the colloquial meaning and the understanding in the industry generally. However, a contractor’s estimate, depending on its terms, can amount to a firm offer so that acceptance by the employer will result in a binding contract. It is sometimes suggested that there is some custom that an estimate is not to be treated as an offer. There is no such custom. On the other hand, a ‘quotation’ is always an offer to do work for a specific sum that, on acceptance, becomes a binding contract.
This is where the price is based on quantities and there is an express right for the work to be remeasured after completion. The ICC contract is one such. SBC with approximate quantities is also a remeasurement contract as is the ‘with quantities’ version in practice.
SBC is a lump sum contract in that a specific total figure is quoted, but it should be noted that the price is subject to alteration for:
2
John Parris memorably said that the only JCT contract that has ever been known to come out at the Contract Sum was that for the renovation of All Souls’ Church in Langham Place, London and that may justly be regarded as a miracle of divine grace.
It is also possible to analyse building contracts by procurement method.
In general, this is where the client commissions an independent architect who may have been the architect who produced designs and construction information, to administer the project during the construction period and deal with the final account. A contractor will have been chosen to carry out the project. If the building is other than small and straightforward, the architect will advise the client to appoint other consultants to deal with particular items, such as quantities, cost estimating, structural calculations and building services design. The contractor may have a minor degree of design responsibility.
The essentials of traditional procurement are that the architect is the independent adviser to the client responsible for the design. The contractor is only responsible for executing the work in accordance with the drawings and specifications produced by the architect and other professionals.
It has much in common with the traditional system. However, the architect may not be the leader of the team, The project manager, of course, can be an architect. Essentially, the project management system places most emphasis on planning and management. Therefore, a person, whether architect, engineer or surveyor, with the relevant project management skills is required. The project manager is likely to appear in one of two principal roles; either simply as the technical agent of the employer for the purposes of the project or as the professional with the authority to manage the project, including organising and co-ordinating all consultants. In either case, the project manager acts as a link between the client and the design team. Depending upon the particular kind of project management chosen, the contract administrator may be the project manager or the architect.
This is a system that places responsibility for both design and construction in the hands of the contractor. There are variations in the name and there are subtle differences in meaning. Design and build, for example, refers to the basic system where a contractor carries out the two functions. Design and construct includes design and build and other types of construction such as purely engineering works. Develop and construct often describes a situation where a contractor takes a partially completed design and develops it into a fully detailed design. Package deal can be used to refer to either of these. In theory, the term suggests that the contractor is responsible for providing everything in one package and it is particularly apt when referring to an industrialised building. Turnkey contracting is a system in which the contractor really is responsible for everything, including furniture and pictures on the walls if required. The idea is that the employer simply turns the key and begins using the building – hence the name.
Unless the building is very simple, the contractor will seek an architect to carry out the design. From the client’s point of view, an independent adviser is required to look after the client’s interests before, during and after construction.
This is comparatively rare. Single-point responsibility rests with a professional who may be architect, engineer or surveyor. Besides being responsible for the design of the project, the professional also manages the project in the sense of managing the other professionals and also the construction process in the form of, probably, a number of sub-contractors and suppliers. In this situation, the architect must be careful to explain to the employer that if the employer requires independent professional advice, another architect must be appointed. This type of procurement is suitable where relatively small projects require very detailed control over every aspect of the design detailing.
In this system the contractor is selected at an early stage. It is not normally responsible for carrying out any of the construction work. The contractor simply has a management function for which a fee is paid. The construction work is divided into a number of packages with the contractor’s advice and tenders for these individual packages are invited as appropriate to suit the programme. The works contractors are in contract with the management contractor and the employer pays only the works contracts’ costs without the addition of any contractor’s overheads or profit. In this respect the system has something in common with prime-cost contracting.
This is the system most often referred to as ‘fast track’. The idea being that work begins on site as soon as sufficient information has been produced to enable the first works contractors to start. The architect and other consultants are then involved in a constant race against time to produce the remainder of the drawings in time for the succeeding works packages.
This system calls upon the contractor to act simply in a management capacity for which a fee is paid. The design team is often appointed directly by the employer, but in some instances the contractor may appoint. In such cases, the system has some of the flavour of project management. The key difference between this system and management contracting is that the individual works contractors (they are usually termed ‘trade contractors’ under this system) are in contract with the employer.
Although details vary, the construction manager is usually responsible for managing not only the trade contractors, but also the other consultants. Some very large projects have been carried out using this system, which calls upon the same kind of skills from the design team as required under the management contract.
A bespoke contract is like a bespoke suit or a house designed for a specific family. Both are designed to match precisely the requirements of the purchaser.
In theory, it is much better to have every construction contract specially drafted to suit the detailed requirements of employers and/or contractors. In practice, such contracts would have their own particular disadvantages. They would each be much more expensive than a standard ‘off the peg’ contract. Instead of buying them for £40 and £50, it would cost several thousand pounds each time. Producing a bespoke contract would take time while requirements were thoroughly investigated and all the terms carefully drafted to ensure that all eventualities were covered.
Contractors may be loath to tender on the basis of an unfamiliar contract and if they tender they may submit an increased price to reflect the unknown contract. Architects will be unused to administering strange contracts and may well charge additional fees for doing so. Mistakes and wrong assumptions can be made as the parties begin to understand how each new contract works. Just as they all get used to it, the project will be complete and the next project will have a different bespoke contract. The situation would not be quite as bad as that of course, because every contract would have certain things in common. It is out of the common elements that the standard form emerges.
Standard forms of contract are relatively inexpensive. But the standardised versions of anything are based on a notion of a majority requirement. This is the main disadvantage of a standard form of contract. Acknowledging that one form will not suit every case, the JCT produces several different standard forms each one designed for a particular category such as Design and Build, Prime Cost and Traditional (see the list in Section 1.5 below). Even the ‘Traditional’ category has three distinct versions. Standard forms of contract are like standard suits, standard cars or standard housing. They are good enough across a broad spectrum of applications, but they are seldom entirely appropriate. The more complex the application the more unlikely it is that a standard solution will be right.
A big advantage with standard forms is that they are usually drafted by people with particular expertise in that particular field and the forms evolve over the years to suit changes in legislation and in line with decisions handed down by the courts. The result is, or should be, that the best parts of the forms are retained, mistakes are removed and omissions are rectified. Moreover, architects and contractors become used to them.
There is a danger that arises out of the number and variation of standard forms. Few if any architects and quantity surveyors can really get to grips with the differences. Architects and project managers commonly use forms with which they are familiar but that may not always be suitable for the procurement route and attendant circumstances. Too many architects always use the same standard form no matter what the circumstances. That may amount to professional negligence. It is possible to drive from Birmingham to Winchester in a tank, but to go by car is infinitely preferable. Therefore, the choice of the right standard form is important.
In order to avoid the substantial expense of having a form of contract especially drafted, but to overcome the problems inherent in a standard product that may be nearly but not quite suitable, employers sometimes have standard forms amended to suit their detailed requirements. That seems to be a sound idea in principle. However, the best advice is never to amend standard forms. That is principally because it is difficult to ensure that any amendment works correctly in the context of the form as a whole and there is a real danger that, say, the deletion of a clause is not carried through to delete all references to it and to amend anything else that depends upon that clause. Modern building contracts are complex documents with a multitude of interlocking provisions. Moreover, the person charged with administering the contract must be aware of the detailed effect of the amendments. Amendments are often necessary to ‘customise’ a standard form, but they should be carried out only by specialists who should clearly explain the effects of the amendments.
A list of available JCT building contracts and sub-contracts at the time of writing is shown in Table 1.1.
The most commonly used JCT contracts are probably:
SBC – For use for larger Works that are designed for the employer and the contract is administered by an architect/contract administrator. The Works can be carried out in sections and there is provision for the contractor to design parts of the Works.
IC and ICD – For use for Works without complex services up to a value of about £450,000 where fairly detailed contract terms are required and that are designed for the employer and the contract is administered by an architect/contract administrator. The Works can be carried out in sections and, in ICD, there is provision for the contractor to design parts of the Works.
MW and MWD – For use for simple Works up to a value of about £200,000 where detailed contract terms are not required and that are designed for the employer and the contract is administered by an architect/contract administrator. In MWD, there is provision for the contractor to design parts of the Works.
DB – For use where the contractor is to design and build the project in accordance with the Employer’s Requirements. The Works can be carried out in sections.
There are other contracts in use:
THE ACA FORM OF BUILDING AGREEMENT (ACA 3) – A relatively straightforward contract suitable for any size and value of project, basically a traditional contract with several options, some of which will effectively turn it into a design a build contract.
THE ACA STANDARD FORM OF CONTRACT FOR PROJECT PARTNERING (PPC2000) – An unusual contract in that it is multi-party and can be entered into by a mixture of client, contractor, consultants and certain sub-contractors. It is intended to be a partnering contract and it is recommended by Constructing Excellence as a means of encouraging collaborative working. It is endorsed by the Construction Industry Council. Although theoretically suitable for all sizes and values of project, its full benefits will only be experienced when used for projects over about £800,000.
THE GENERAL CONDITIONS OF GOVERNMENT CONTRACTS FOR BUILDING AND CIVIL ENGINEERING WORKS (GC/WORKS/1 (1998)) – Although originally drafted for government use, this contract has become quite popular for ordinary commercial projects. It is suitable for all kinds of major project work and there are several versions including design and build.
ENGINEERING AND CONSTRUCTION CONTRACT (NEC 3) – A contract that has become very popular for civil engineering work and it is used, and in some places strongly advocated, for building work. The philosophy of this form is intended to be different from that of the more common JCT and other contracts and, in wording, grammar, clause numbering and approach, it is very different from other contracts. It has been the subject of criticism by legal commentators and in court. The form is said to comply fully with the AEC (Achieving Excellence in Construction) principles. The title page records that the Office of Government Commerce (OGC) recommends the use of NEC 3 by public sector construction procurers on their construction projects. It has a number of options capable of turning it into different kinds of contract, e.g., target, management and cost reimbursable contracts.
Table 1.1 JCT Building contracts and sub-contracts (sub-contracts shown in italic).
| Standard Building Contract (SBC) With Quantities (SBC/Q) With Approximate Quantities (SBC/AQ) Without Quantities (SBC/XQ) Standard Building Sub-Contract with sub-contractor’s design Agreement (SBCSub/D/A) Standard Building Sub-Contract with sub-contractor’s design Conditions (SBCSub/D/C) Standard Building Sub-Contract Agreement (SBCSub/A) Standard Building Sub-Contract Conditions (SBCSub/C) Intermediate Building Contract (IC) Intermediate Building Contract with contractor’s design (ICD) Intermediate Sub-Contract Agreement (ICSub/A) Intermediate Sub-Contract Conditions (ICSub/C) Intermediate Sub-Contract with sub-contractor’s design Agreement (ICSub/D/A) Intermediate Sub-Contract with sub-contractor’s design Conditions (ICSub/D/C) Intermediate Named Sub-Contract Tender & Agreement (ICSub/NAM) Intermediate Named Sub-Contract Conditions (ICSub/NAM/C) Intermediate Named Sub-Contractor/Employer Agreement (ICSub/NAM/E) Minor Works Building Contract (MW) Minor Works Building Contract with contractor’s design (MWD) Minor Works Sub-Contract with sub-contractor’s design (MWSub/D) Design and Build Contract (DB) Design and Build Sub-Contract Agreement (DBSub/A) Design and Build Sub-Contract Conditions (DBSub/C) Major Project Construction Contract (MP) Major Project Sub-Contract (MPSub) Construction Management Trade Contract (CM/TC) Construction Management Appointment (CM/A) Management Building Contract (MC) Management Works Contract Agreement (MCWC/A) Management Works Contract Conditions (MCWC/C) Management Works Contractor/Employer Agreement (MCWC/E) Prime Cost Building Contract (PCC) Measured Term Contract (MTC) Framework Agreement (FA) Constructing Excellence Contract (CE) Constructing Excellence Project Team Agreement (CE/P) Repair and Maintenance Contract Commercial (RM) Pre-Construction Services Agreement (PCSA) Building Contract for a Home Owner/Occupier (HOB) Building Contract and Consultancy Agreement for a Home Owner/Occupier (HOC) |
3
The first standard form of building contract in the United Kingdom came into use towards the end of the nineteenth century. It had just nineteen clauses. After 1903 until 1977, it became known as ‘the RIBA contract’. After that, it was called the ‘JCT contract’. Despite the change, the judges took a long time to adjust and the law reports are full of references to ‘the RIBA contract’ for many years afterwards.
4
From 1903, the Standard Form of Building Contract was put together by a body consisting of representatives of the RIBA, the Construction Confederation (CC) as it is now called, and the Institute of Building (IOB), as it then was. In 1931, the IOB withdrew, so that henceforth, the body was a ‘Joint’ one consisting of the RIBA and the National Federation of Building Trades Employers (NFBTE), now the CC. In 1952, the Royal Institution of Chartered Surveyors (RICS) became involved and by the year 1963, the Joint Contracts Tribunal consisted of representatives of ten bodies in the construction industry. Bodies representing sub-contractors eventually joined. The Standard Form was substantially rewritten in 1939, 1963 and 1980. Following a great many published amendments, it was revised in 1998 and again substantially revised in 2005. The current version (2011) was amended principally to take account of changes in legislation.
SBC is available in 3 versions:
SBC/Q is the version that will be considered in this book.
SBC/AQ is used where approximate quantities are to be provided that are subject to remeasurement. The reason for using this version may be because there is insufficient time to produce the detailed drawings necessary for the preparation of accurate bills of quantities or it may be that the nature of the project means that quantities cannot be known with accuracy until the construction work is in progress. Obviously, there can be no Contract Sum and the final cost cannot be known until the Works are complete or nearly so.
SBC/XQ is used where it is thought that the nature of the Works does not warrant quantities and, therefore, drawings together with a specification or work schedules have been provided. Effectively, the contractor is being asked to prepare its own quantities from the information provided. Whether contractors are prepared to submit a price on that basis rather depends on the overall value of the Works and whether any contractor is short of work.
All of these versions are suitable for use by private and local authority employers.
SBC uses the words ‘Works’ with a capital ‘W’ to mean the total of all the work, goods and materials that the contractor agrees to provide and it includes all variations.
5
It is important to understand what the contract means when it refers to drawings. In this context, a drawing is a visual representation of a building or a part of a building to a particular scale. The contract also refers to ‘details’ that are usually taken to mean a large scale drawing of a relatively small part of the building. Where ‘details’ plural is mentioned what it usually intended is an in-depth description rather than a drawing. For example, details of sanitary fittings may best be conveyed by means of a schedule and specification.
Drawings can be categorised in different ways. So far as SBC is concerned, there are two specific kinds of drawings:
third recital
eleventh recital.
2.11
2.12,
3.14
2.9.4 and 2.9.5
2.40
6
Copyright in the architect’s drawings (and in specifications, schedules and the like) is owned by the architect. What that means is that although someone else may actually have or even own the drawings, they cannot copy or reproduce what is on them without the architect’s permission. The law concerning copyright is quite complex and it is a mixture of legislation and decisions of the courts. If the architect and client have entered into terms of engagement as they should, the terms will usually state that the client has a licence to use the drawings when the architect’s fees are paid. If they have not entered into a proper formal agreement, the law will usually imply a term (see Chapter 4, Section 4.3) that the client has the right to reproduce the architect’s drawings in the form of a building when the client has paid a reasonable fee. Like many terms that are implied, it is not always easy to say what a reasonable fee might be.
2.41
The contract specifically states that copyright in drawings and other documents supplied by the contractor will remain in the contractor’s ownership (the usual term is ‘vested’ to mean that the contractor owns the right). But the contractor grants a licence to the employer to copy and use the documents for any purpose including the main purpose of reproducing them in relation to the Works. The only exclusion is that the employer may not reproduce the designs in order to carry out any extension to the finished building. That is a standard exclusion in copyright clauses to prevent someone using the documents for purposes that go beyond what is necessary for the Works in question.
There is a proviso that all sums due and payable to the contractor must have been paid. Subject to that, the licence is said to be ‘irrevocable’ – it cannot be withdrawn under any circumstances. It is said to be ‘royalty-free’ – which is just a way of saying that the contractor cannot expect any payment other than what it receives under the contract terms. It is said to be ‘non-exclusive’ – which is the normal position. If the contractor was to grant an exclusive licence it would prevent anyone (including the contractor) from using the documents again for another purpose. The grant of a non-exclusive licence makes clear that the contractor still retains its rights over the documents.